抗倍特挂墙板挂墙技术交底
一、安全措施
1、 Security measures
1、板在吊装运输时应侧立,并用工具,不得用钢管直接穿在抗倍特挂墙板的圆孔内;搬运用铁丝、绳索应绑牢,防止抗倍特挂墙板脱落伤人。
1. When lifting and transporting the board, it should be erected on the side and tools should be used. Steel pipes should not be directly inserted into the circular holes of the anti magnification hanging wall board; The iron wire and rope used for transportation should be tied tightly to prevent the anti magnification hanging wall panel from falling off and injuring people.
2、严格遵守各种机械的操作规程,特殊工种必须持证上岗,非操作人员不得乱动机具,以防伤人。
2. Strictly abide by the operating procedures of various machinery, special occupations must be certified, and non operators are not allowed to move machinery to prevent injury.
3、机电器具必须安装触电保护装置,发现问题及时修理,不得违章操作,野蛮施工。
3. Mechanical and electrical equipment must be equipped with electric shock protection devices, and problems must be repaired in a timely manner. Violation of regulations and rough construction are not allowed.
4、不得在施工操作面内私拉乱接电线。使用前必须有电工检查线路以及机具是否完好,检查完后方口使用,使用结束后及时切断电源。
4. It is not allowed to privately pull or connect wires within the construction operation area. Before use, an electrician must check whether the wiring and equipment are in good condition. After inspection, they can only be used. After use, the power should be cut off in a timely manner.
5、积极与土建施工队配合,及时协调夜间垂直运输问题。不得私自动用龙门架卷扬机及搅拌机,以防安全事故的发生。
5. Actively cooperate with the civil construction team and timely coordinate vertical transportation issues at night. Do not use the gantry hoist and mixer without authorization to prevent safety accidents.
6、在卫生间抗倍特挂墙板施工时必须采取措施封盖好上层管道井洞口,以防坠物伤人。
6. During the construction of anti magnification wall panels in the bathroom, measures must be taken to seal the upper pipeline well openings to prevent falling objects from injuring people.
7、施工现场不得动用明火,以防发生火灾。如确需动用明火,必须上报项目部并有项目部安全员开出动火证,并配备灭火器,设专人负责看火,方口使用明火。8、安装抗倍特挂墙板时,施工人员尽可能不要站在抗倍特挂墙板的两侧,如确需在此施工必须做好保护措施,用钢管做临时支撑,以防抗倍特挂墙板倾覆伤人。
7. Open flames are not allowed to be used on the construction site to prevent a fire. If it is necessary to use open flames, it must be reported to the project department and a fire permit must be issued by the safety officer of the project department. Fire extinguishers must be equipped, and a dedicated person should be responsible for watching the fire and using open flames. 8. When installing anti magnification wall panels, construction personnel should try not to stand on both sides of the anti magnification wall panels. If it is necessary to carry out construction here, protective measures must be taken, and steel pipes should be used as temporary support to prevent the anti magnification wall panels from overturning and injuring people.