富美家抗倍特挂墙需要注意的措施
来源:https://www.fumeijia.net/ 日期:2023-03-15 发布人:admin
1、工艺流程测量放线、出实际测量图→排版→板材加工→主龙骨安装→副龙骨安装→定位打孔、固定挂件→饰面板安装→竣工清理;现场安装龙骨和后台板材生产可同时进行,能节省工期;
1. Process flow measurement and setting out, drawing out actual measurement drawings → typesetting → plate processing → main keel installation → auxiliary keel installation → positioning and punching, fixing hanging parts → decoration panel installation → completion cleaning; On-site keel installation and back-office plate production can be carried out at the same time, which can save the construction period;
2、测量放线、出实际测量图进口板材为国外厂家定尺产品,而且受加工机具和精度的要求,只能在工厂加工成型,现场不具备加工条件。受砖缝影响,现场安装调整量在2mm以内,因此要求严格测量出建筑物的实际尺寸。除测量建筑物的几个大角外,所有门窗尺寸、位置都应予以实测,套方找正,并根据测量结果绘制实际测量图,并以此作为排版的前提。如果有必要,窗洞口位置还须根据排版要求作微量调整。还要考虑与其他区域不同材料交圈的具体情况,实际测量结果给后续工作带来很大便利;
2. The imported plates for measuring and setting out and drawing the actual measuring drawings are the fixed-length products of foreign manufacturers, and can only be processed and formed in the factory due to the requirements of processing machines and tools and accuracy, and there are no processing conditions on the site. Due to the influence of brick joints, the on-site installation adjustment is within 2mm, so it is required to strictly measure the actual size of the building. In addition to measuring several large corners of the building, the size and position of all doors and windows should be measured, square and aligned, and the actual measurement map should be drawn according to the measurement results, which is the premise of typesetting. If necessary, the window opening position must also be slightly adjusted according to the typesetting requirements. It is also necessary to consider the specific situation of the circle crossing with different materials in other regions, and the actual measurement results will bring great convenience to the follow-up work;
3、排版受砖缝和板材定尺的影响,使用计算机和CAD软件进行排版,经过反复优化,考虑板材大利用率,在取得终排版方案后,针对每一块板材细化加工图及相应的开槽图及板材四周的企口加工图,一一编号,作为加工依据;
3. The layout is affected by the brick seam and the plate sizing. The computer and CAD software are used for layout. After repeated optimization, the maximum utilization rate of the plate is considered. After the final layout plan is obtained, the detailed processing drawing and the corresponding slotting drawing of each plate and the groove processing drawing around the plate are numbered one by one as the processing basis;
4、板材加工根据加工图,所有板材均要求使用数控平板切割刨槽机进行加工,精度误差要求在0?5mm以内,以确保安装精度;
4. According to the processing drawing, all plates are required to be processed with CNC flat plate cutting and grooving machine, and the accuracy error is required to be within 0? Within 5mm to ensure installation accuracy;
5、龙骨制作安装所有龙骨均进行热镀锌处理,焊缝涂刷防腐漆,焊接材料必须符合国家标准。龙骨安装后,必须进行反复检查校正,对于横龙骨可采用经纬仪作通长检查。
5. Keel fabrication and installation All keels shall be hot-dip galvanized, and the weld shall be painted with anti-corrosion paint. The welding materials must meet the national standards. After the keel is installed, it must be checked and corrected repeatedly. For the horizontal keel, the theodolite can be used for the overall length inspection.
6、定位打孔、固定挂件板材加工完成后,按加工图一一核实,检查无误后按设计位置对板材背部的挂件进行定位,并按要求打孔,安装挂件,要求定位误差控制在±0?5mm,并逐一检查牢固性。打孔必须对电钻加限位装置,防止钻深。
6. After the processing of the plates for positioning, punching and fixing the hanging parts is completed, verify them one by one according to the processing drawing, and then position the hanging parts on the back of the plates according to the design position, punch holes as required, and install the hanging parts. The positioning error is required to be controlled within ± 0? 5mm, and check the firmness one by one. The electric drill must be equipped with a limit device to prevent drilling depth.
7、板材安装安装顺序原则上是自下而上、自边而内安装,后窗台收口。安装时注意及时将插片插入竖向槽内,同时注意企口朝向是否正确。每安装铺设1排墙板后,应检查一次垂直度和平整度,调整板缝宽度,以便及时消除安装误差;饰面板安装完毕后,也可用硅酮胶、收口条处理企口4mm黑缝隙(看设计风格而定,一般也不用处理),要注意在易于被污染的部位用塑料薄膜覆盖保护。
7. In principle, the installation sequence of plates is from bottom to top, from side to inside, and finally the window sill is closed. During installation, pay attention to inserting the insert into the vertical slot in time, and pay attention to whether the groove orientation is correct. After each row of wallboard is installed and laid, the verticality and flatness shall be checked once, and the width of the board joint shall be adjusted to eliminate the installation error in time; After the installation of the decorative panel, the 4mm black gap of the rabbet can also be treated with silicone rubber and closing strip (depending on the design style, it is generally not necessary to treat it). Pay attention to cover and protect the parts prone to pollution with plastic film.
8、竣工清理在全部工序完成后进行检查验收,验收合格后然后统一撕去板材的保护膜,对于板材的局部污染,可采用中性清洗剂进行清理。
8. The completion cleaning shall be inspected and accepted after the completion of all processes. After the acceptance, the protective film of the plate shall be uniformly removed. For the local pollution of the plate, neutral cleaning agent can be used for cleaning.
上一篇:厨房墙面防火装修面板使用特点
下一篇:富美家防火板的防火等级
Related products相关新闻