    常见问题

    墙面快装板怎样安装?

    来源:https://www.fumeijia.net/ 日期:2021-12-13 发布人:admin
    墙面快装板安装步骤一:
    Installation step I of wall quick mounting plate:
    拼缝处应装有密封胶,在完成前一道工序后,将被下一道工序覆盖。
    The joint shall be equipped with sealant, which will be covered by the next process after the previous process is completed.
    墙面快装板安装步骤二:
    Installation step 2 of wall quick mounting plate:
    金属面夹芯板墙板的竖缝应采用槽形缝或工字形铝缝。“隐蔽工程”可分为水上安装,甚至可能危害人身安全。框架应与横梁连接,上部隔板,外墙板和门窗框应连接;然后应安装楼板檩条,外面板应向下重叠。实际上,这种轻钢结构用于平整围墙和隔断墙的基础,更好地使用钢筋混凝土,安装楼梯,铺地板,然后向上安装一层,然后安装屋顶桁架和屋顶面板。
    The vertical joint of metal faced sandwich panel wall panel shall adopt slot joint or I-shaped aluminum joint. "Concealed works" can be divided into water installation, which may even endanger personal safety. The frame shall be connected with the beam, and the upper partition, outer wall panel and door and window frame shall be connected; The floor purlins shall then be installed and the outer panels shall overlap downward. In fact, this light steel structure is used to level the foundation of the enclosure and partition wall, make better use of reinforced concrete, install stairs, lay the floor, then install one floor upward, and then install the roof truss and roof panel.
    墙面快装板安装步骤三:
    Installation step 3 of wall quick mounting plate:
    富美家复合墙板
    安装门窗等,拉竖向支撑。还有就是卫生洁具啊、小五金之类的,嵌入式墙板的上下搭接缝应采用企口缝、电安装及防潮、防水等项目。其中的每一个项目都不容忽视,如果哪一个环节出了问题,都可能带来严重的经济损失,表面装饰得再漂亮,也是徒劳;然后立柱子、墙梁或楼面次桁架的连接应使用螺栓连接。连接螺栓横向间距应不大于500mm(每块板宽度方向设置不少于两个螺栓)。
    Install doors and windows and pull vertical support. There are sanitary ware, hardware and so on. The upper and lower lap joints of embedded wallboards should adopt tongue and groove joints, electrical installation, moisture-proof, waterproof and other items. Every project can not be ignored. If any link goes wrong, it may bring serious economic losses. No matter how beautiful the surface decoration is, it is futile; Then, the connection of vertical columns, wall beams or floor sub trusses shall be bolted. The transverse spacing of connecting bolts shall not be greater than 500mm (no less than two bolts shall be set in the width direction of each plate).
    墙面快装板安装步骤四:
    Installation step 4 of wall quick mounting plate:
    嵌入式墙板安装应在冷弯薄壁型钢结构安装时及时镶人柱子两侧槽内。
    The embedded wallboard shall be inserted into the grooves on both sides of the column in time during the installation of cold-formed thin-walled steel structure.
    以上的精彩内容来自:济南创图贸易有限公司富美家快装板的介绍及分享,更多内容请继续关注我们:http://www.fumeijia.net
    The above wonderful content comes from the introduction and sharing of fumeijia Express board of Jinan chuangtu Trading Co., Ltd. please continue to pay attention to us for more content: http://www.fumeijia.net
    联系我们

    产品销售热线:18660816658

    技术方案咨询:18560211715

    仓库地址:山东省济南市天桥区金鑫产业园303仓库

    九江工厂:九江市江东大道3号

    台湾新竹工厂:台湾新竹

    泰国曼谷工厂:泰国曼谷

    关注我们
    山东创图建筑装饰工程有限公司 备案号:鲁ICP备14019259号-2 网站地图 XML TXT 鲁公网安备37010502002020号

    截屏,微信识别二维码

    微信号:18660816658